Plan2Reality
Turning field reports into schedule updates a planner can review.
- Field reportWork on the north stretch paused.
- Schedule matchFind the activity the report may affect.
- Planner reviewConfirm the match before updating the plan.
A field report might say that work stopped on the north stretch. It may leave out the name of the schedule activity, how long the delay will last and what else depends on it.
Our team built Plan2Reality as a Smart India Hackathon prototype. I worked on connecting field updates to schedule activities and making the proposed match inspectable. A planner can see the original excerpt and the evidence for the match before accepting it.
Leaving an ambiguous match open
The prototype routes a weak match to a planner for review. Once a mapping is accepted, schedule rules determine which downstream activities it could affect. The planner can trace the decision back to the field report.